Today, I vow to finish laying down my new kitchen floor! It’s taken me about a week. More pics to follow.

Kitchen floor. Done. Almost.
·1 min
Related
The Man Cave Kitchen, Part 1
·1 min
In order to move into The Hovel, I must have some kind of working kitchen. While I could simply eat out every day, assuming I actually wished to prepare any food at home, I suppose I could get by with a sink, a hot plate, and a camping cooler (been there).
The Man Cave Cometh
·1 min
**June 2nd **is the DROP DEAD move in date to the hovel - come what may.
Have:
Roof (leaky)
electricity
fridge *
range *
some furniture
cold water in bathroom
working toilet
Kitchen Floor
·1 min
Hard to believe I’m still working on this, but I am. Must do something about this floor. I’m resolving to resolve it within the week.



