Skip to main content
  1. Blog/

Waiting On Parts

·1 min
Author
Lance Barker
Exploring my own creative expression and building things that help people.

Before I get a real water heater, I’m rigging up a solar variety - a very simple one - using a black hose on the roof. Of course this is nothing new. It’s done all over the world and makes such sense. Why wouldn’t you want to cut pollution and save money by letting the sun heat, or pre-heat your water?

But, I didn’t have all the parts I needed. They should be here mid-week and I should have some warmth by next weekend. The first phase is a test. 200 feet of 1/4 inch black irrigation pipe just laying up on the roof. Fed through cold water pressure, it shoots up through the roof, loops through the coil, back down through the roof and straight into the hot water line.  Other tinkering will include trying different lengths and diameter of piping, and placement of the coil including inside a glazed insulated box. 

Later on when I obtain the right electric water heater, I’ll use the loop to pre-heat water. 

Related

Behold, the Plywood Kitchen.

·1 min
Small steps forward and back, along with help from friends (thanks so much Lorne and Chris!) and here I am. My kitchen is forming and so close to being usable - in a man cave sense. Just finished the floor. I should have cold water working in the sink today, with warm/hot water from passive solar working by end of next week. Then I’ll move on to putting up pantries and figuring out what to do with these plywood counter tops. Next, maybe some painting and cabinet doors.